Remodels that respect the house you love.
Kitchens, baths, additions, and full-home renovations. We handle the permits, the trades, the timeline — and protect the spaces you keep using while we work.
A remodel is a
sequence problem.
Most remodels don't fail at the finish — they fail at the schedule. Trades stepping on each other. Cabinets that don't fit because the framing wasn't right. Tile that can't be ordered for six weeks because nobody locked it in.
We run remodels like a project, not a vibe. Demolition, structural, mechanical rough-in, drywall, tile, cabinets, paint, punch list — sequenced on a calendar, with the next trade scheduled before the current one walks off.
The result is a remodel that lands on time, on budget, and with the rest of your house clean enough to live in while we work.
The remodels we run every season.
Kitchen Remodels
Full gut kitchens, layout reworks, island installations, custom cabinet installs.
Bathroom Remodels
Primary baths, guest baths, powder rooms — including curb-less showers and full tile work.
Room Additions
Single-room additions, primary suite additions, second-story additions.
Whole-Home Remodels
Down-to-the-studs whole-home renovations, including kitchen, baths, and structural work.
ADU Conversions
Garage-to-ADU and detached ADU construction — permitted, plumbed, and metered to current code.
Open-Concept Reworks
Wall removals with proper LVL beam installation and structural engineering.
The houses we left better than we found.
Kitchen + Family Room Remodel
A wall-removal kitchen remodel in Santa Rosa — opening the kitchen to the family room with a 16-foot LVL beam. Custom cabinets, quartz tops, integrated appliances.
Discuss This ProjectPrimary Bath Renovation
A curb-less wet room with heated floors, large-format porcelain tile, and a custom oak vanity. Plumbing relocated, full waterproofing assembly to TCNA spec.
Discuss This Project600 sq. ft. Addition
A primary suite addition tied into an existing 1960s ranch in Sebastopol. Engineered tie-in, matching exterior, no telegraph cracks.
Discuss This ProjectRemodels — frequently asked.
A typical full-gut kitchen runs 8-14 weeks from demo to final punch list. Larger remodels involving wall removals, additions, or structural work extend that timeline. We give a Gantt-level schedule before contract signing.
Make the house better.
Kitchen, bath, addition, or whole-home — same standard, same crew.